Martin Harris
IT Project Manager
20 years experience delivering technical projects.
Startup. Initiation. Execution. Monitoring. Closure.
Applications | Cloud | Datacentres | Networking
Office Builds & Relocations | Servers & Storage | Telecoms

martinharris10@icloud.com
+44 (0)78 525 789 33
Download my CV
Introduction
I started my career in IT in 1993 after University and spent 10 years in IT Support.
In 2003, I moved into IT Project Mgt for a financial trading company in the City of London. In 2011, I became an independent IT contractor and have been doing it ever since.
I have worked for large City of London financial and insurance companies, incl. the London Stock Exchange Group and Lloyd's of London. I just need the Bank of England to complete the set.
For the last few years, the focus has been deployments and migrations to the cloud.

February 2025 - Present
Access Group
IT Project Manager (Contractor)
Migrations, upgrades and deployments of IT solutions for Access Group's clients.
August 2024- December 2024
Lloyd's of London
IT Project Manager (Contractor)
Development and rollout of a new data submission system that reduces the effort required from Managing Agents and Syndicates.
August 2023 - August 2024
MKK Lion Ltd
Founder
I spent a year setting up and running my own business, concentrating on clothing sales and horse racing using mathematical models.
July 2020 - August 2023
London Stock Exchange
IT Project Manager (Contractor)
Migrations and deployments into the cloud. Enhancement of cloud services.
January 2020 - June 2020
TP ICAP
IT Project Manager (Contractor)
Server & app migration to a new OnPrem datacentre.
Career History
Proj Mgr since 2003
February 2019 - December 2019
Lloyds of London
IT Project Manager (Contractor)
Migration of servers and databases to Azure.
June 2015 - December 2018
MS Amlin
IT Project Manager (Contractor)
Application upgrades, migrations to Azure, datacentre relocations.
November 2013 - January 2015
CMC Markets
IT Project Manager (Contractor)
Datacentre relocation and server estate refresh
September 2011 - September 2013
Ladbrokes
IT Project Manager (Contractor)
Software development and upgrades.
Grand National planning.
June 2003 - September 2011
CMC Markets
IT Project Manager (Permanent)
Delivery of software, infrastructure and office fit-outs.
December 2001 - May 2003
CMC Markets
IT Support Manager (Permanent)
24x7 client support, internal staff and infrastructure.
October 2000 - September 2001
Merrill Lynch HSBC
IT Project Manager (Contractor)
Software deployment for their Wealth Mgt business.
January 1998 - September 2000
Merchants Group (Ireland)
IT Support Manager (Permanent)
24x7 support of 15 call centre staff and infrastructure.
July 1995 - January 1998
Merchants Group (UK)
IT Support Engineer (Permanent)
Internal desktop support in a call centre business.
June 1993 - July 1995
Webbs Country Foods
IT Project Manager (Permanent)
Internal desktop support for a food manufacturing business.

Cloud
Migrating apps to the Cloud has been the most common project for the last five years
Since 2018, I have worked consistently on Cloud-based projects.
- Migrating servers and databases from OnPrem to AWS and Azure.
- Deploying IaaS and PaaS services.
- Decommissioning legacy OnPrem infrastructure.
- Deploying leading edge software; Google Anthos, Snowflake and CloudHealth integration.
- Working on the joint venture between the London Stock Exchange and Microsoft to migrate to Azure.
LSEG Microsoft Partnership Programme
January - December 2023, London Stock Exchange Group
I was part of a large team, working on the joint partnership with LSEG and Microsoft, to build new environments in Azure, migrate existing applications to Azure and refresh and redefine the way of working and operating models employed by LSEG.
Enhancing cloud services
January - December 2022, London Stock Exchange Group
I project managed multiple work streams to enhance and improve the company's cloud service
-
risk and compliance controls
-
automation and pipelines
-
financial optimisation
-
cloud migration procedures
-
legacy account migrations
-
service effectiveness
-
automation of engineering tasks
I project managed one of the 'pillars' in a partnership between LSEG and Microsoft, to build new landing zones in Azure and migrate apps. My pillar was responsible for implementing a new DevOps 'target operating model', to be deployed across the entire company, liaising with Microsoft and internal lines of business.
Deployment for a new 'landing zone' in AWS for Snowflake
January - December 2021, London Stock Exchange Group
Working with a 3rd party consultant, Hexaware, I managed...
-
The build and deployment of automated pipelines to create a new landing zone for Snowflake.
-
Non-Prod and Prod environments to allow other parts of the business to migrate their data requirements into Snowflake.
-
Discovery and design to document what will be delivered to ensure internal standards and requirements are met.
In January 2021, implementation and deployment of the new landing zone in AWS.
Build & Deployment of 'Google Anthos on AWS' in the UK
July - November 2021, London Stock Exchange Group
I project managed the build and deployment of a new Google Anthos on AWS platform. Working with the in-house Cloud Engineering Team, an external consultancy and Google themselves, the new platform was designed, built and deployed.
This was one of the first deployments of Google Anthos on AWS in the United Kingdom. The product was still official in 'beta' when we started. New Dev, Test and Production environments were built, automated pipelines using Jenkins created and incorporating Information Security requirements like sign-on protocols and role-based access control (RBAC), container scanning using BlackDuck, monitoring and alerting using DataDog, financial operations information into CloudHealth, etc.
In October 2020, the first application was migrated to containers, passed all necessary testing and went into production - 4 months after the project started.
Migration of servers and databases from Windows / SQL 2008 onto supported versions, putting as much as possible into Azure
February - December 2019, Lloyds of London
I project managed the migration of approx 400 Windows 2008 servers and 600 SQL 2008 databases to supported versions of Windows and SQL, moving as much as possible into Azure and decommission around 1,200 servers and databases. We adopted an Agile methodology with two-week sprints, to manage work and resources and track progress.
The kind of tasks that I had to manage included…
-
Produce design documentation and runbooks.
-
Build servers and databases in Azure and OnPrem.
-
Communication with stakeholders and users..
-
Produce test scripts.
-
Complete UAT and dual running.
-
Migrate users to the new deployments.
-
Service transition to Support.
-
Decommission unrequired servers and databases, c. 1,200.
After an initial period to setup and improve operating processes, output had become much faster and more efficient, getting into a ‘factory-like’ process, migrating servers and databases every week from OnPrem into Azure. The project completed on schedule and on budget.
Improving control of VMs in Azure
December 2018, MS Amlin
Once MS Amlin had been running servers in Azure for a few months, it became apparent they were missing some tools to allow them to better control and manage their cloud estate. Having managed the server migration to Azure, they asked me to revisit this project and get these tools installed.
-
CloudHealth was installed to improve financial reporting.
-
Log Collector by SecureWorks, to capture log files from domain controllers and firewalls.
-
Symantec Group Update Provider (GUP) to distribute content updates to client machines in Azure.
-
SCCM expanded so the global SCCM infrastructure could update servers in Azure.
-
Access control was reviewed to any unwarranted access rights.
-
Serial Console was enabled across the estate to allow low level access to each server, independent of the VM's network or OS state.
Cloud migration from OnPrem to Azure (IaaS)
January - July 2018, MS Amlin
I managed the migration of 91 DEV/TEST/UAT servers from a data centre in London to the Microsoft Azure cloud.
A repeatable process was created to migrate servers to Azure.
-
Analysis of the OnPrem servers considering connectivity to other servers/networking that would be required in Azure.
-
Producing migration runbooks.
-
Test scripts were created.
-
Servers were replicated to Azure using the ASR tool.
-
Production service transferred to the new deployments in Azure.
-
Service transition documentation was produced for BAU Support.
-
Decommission the original servers OnPrem.

Datacentres
Building, migrating & decommissioning
Migrate disaster recovery services from Canada to the UK, then decommission the original datacentre
July - December 2018, MS Amlin
MS Amlin wanted to close a data centre in Toronto that hosted a DR environment. I managed the migration of servers from Toronto to the UK, using a combination of vSphere replication to copy the servers across the network and new physical builds. The new DR environment was tested and signed off, app by app, followed by the physical decommission of hardware in Toronto.
Datacentre fit-out & server expansion
January - May 2016, MS Amlin
Installation of additional cabinets and structured cabling into two data centres, to accommodate new HP 3PAR storage, Cisco Nexus 9000s, 2000s, fibre channel switches and eight HP DL servers.
2x simultaneous data centre relocations
July - December 2015, MS Amlin
MS Amlin wanted live services moving between two data centres to enable the £5m sale of a building it owned - all within six months. I managed a team of twenty-five server, storage, networking, data centre and application engineers and architects, to design, deliver and move around one hundred physical servers and another five hundred VMs. The project was completed on time and the building sale proceeded on plan.
Datacentre relocation
October 2013 - January 2015, CMC Markets
15-month project to
-
relocate the datacentre from Docklands to Welwyn Garden.
-
upgrade networking hardware with the latest Cisco switches
-
increase storage capacity adding new Hitachi VSP storage devices
Work carried out included...
-
The new data centre was fitted out with 68 cabinets, cabling, new internet / MPLS / leased lines and telephone lines, new links to Bloomberg, Reuters, Market Prizm and to CMC's other data centres.
-
By early December 2014 (on schedule), all services had been migrated, 75 cabinets and 30 pallets of hardware were disposed of and the original data centre was handed back.
Server estate refresh
October 2013 - January 2015, CMC Markets
15-month project toreplace the entire server estate with new HP hardwareupgrade databases and OS versions to standardise on Windows 2012, RedHat Linux 6.0 and SQL 2012.Work carried out included...Analysis of the server estate leading to 637 servers being decommissioned.£5.9m worth of new servers, storage and networking being purchased.New servers (26 enclosures and 437 blades) were delivered and installed and 963 servers (305 physical and 658 VMs) were either built new or migrated from the original data centre.
Decommissioning in Vienna
2014, CMC Markets
CMC no longer wanted a data centre in Vienna, so new servers were built in London and services migrated. New phone lines were installed into the staff office and the phone system moved and numbers diverted. New data circuits were installed in the sales office to increase bandwidth and provide additional resilience. All the infrastructure and unwanted hardware was decommissioned.
Decommissioning in Singapore
2015, CMC Markets
CMC no longer wanted a data centre in Singapore as services had slowly been moved to London and Sydney. Only a few services remained, so it was a simple project to migrate the outstanding services, decommission the hardware and work with a local supplier for the physical disposal of hardware the dilapidation work, to return the data centre back to its original state for hand-back to the landlord.
Datacentre build, then expansion
2003 & 2005, CMC Markets
In 2003, CMC Markets moved to a new office in The City of London. I managed the construction and fit-out of it's new data centre in the building basement, managing 3rd party contractors and suppliers, budgets and schedules for the physical construction and the installation of the aircon, fire suppression, electrics, UPS and batteries, generator, copper and fibre network cabling and working with Telco's for the installation of new WAN and Phone lines. In 2005, the floorspace of CMC's data centre was doubled, so electrics, aircon, UPS, fire suppression, networking were all upgraded.
I am very experienced at managing datacentre builds and migrations. I have completed a number of datacentre projects, building new facilities, migrations and decommissioning.
All of these involved planning, budgeting and resourcing the project
before moving onto implementation; managing resources, project plans and delivery, cost management, progress, etc.
Delivering network projects
have delivered many types of networking projects over the years...
- Data centre migrations
- Connectivity to market data providers
- Upgrading / expanding / decommissioning networking hardware
- Rolling out global connectivity
- Re-organising VPN connections
- Installing local WiFi.
Networking
New 10Gbps circuits & Cisco Nexus hardware
2016, CMC Markets
As part of CMC's data centre relocation project, I managed the installation of 4x 10Gb/s links between the new data centre and their existing two other sites. New Cisco Nexus hardware worth £1m was purchased and installed, to create a brand new LAN in the new data centre. New Internet and MPLS connections with Verizon and Colt were added. Months later when the servers had been installed and services migrated, the final part of the project was to manage the relocation and integration of the original Cisco Nexus hardware into the new data centre, to increase capacity and resilience.
Replacing market data providers
2014, CMC Markets
CMC replaced BT Radianz and TNS as their primary price providers, with a new supplier, Market Prizm. Four new data circuits were installed between CMC's two data centres and Market Prizm (two per site for resilience). Price data from Deutsche Bank, Goldman Sachs, UBS, Smart Trade and Real Tick was then supplied by Market Prizm (whilst still retaining the original feeds), integrated into CMC's pricing infrastructure and tested. The original BT Radianz and TNS services were decommissioned when CMC's Pricing team signed off the new data supply.
53x VPN migrations
2013, Ladbrokes
I managed the migration of fifty-three VPN connections to Vodafone's data centre, saving Ladbrokes £600K because they could decommission an Internet circuit, saving the renewal budget. Working with Vodafone and 3rd parties, I managed technical resources for the network design work, scheduled change windows and managed the change control processes. All fifty-three VPNs were migrated on schedule.
SkyBet's datacentre relocation
2013, Ladbrokes
Sky supplied data services to Ladbrokes and had their own programme to relocate one of their data centres. I ensured the continuity of services provided by Sky to Ladbrokes customers, by managing the analysis, change and testing of the network between Sky and Ladbrokes. When Sky moved their data centre there was no loss of service to Ladbrokes.
BGP deployment
2013, Ladbrokes
Deployment of new BGP technology across four internet circuits between two data centres in Gibraltar, managing Ladbrokes' internal networking team and the technical resources of the ISPs.
WiFi installation
2012, Ladbrokes
I managed the installation of two WI-FI networks, at Ladbrokes' Crayford Greyhound Track, in their hospitality centre and their restaurant.
Decommissioning old XML price feeds
2011, Ladbrokes
I decommissioned uncontrolled outbound XML price feeds and migration of 3rd parties to a single, managed production feed, allowing Ladbrokes to control who they were giving access to their data feed.
Worldwide MPLS deployment
2011, CMC Markets
I managed the deployment of a new worldwide MPLS network to eighteen offices in Europe, APAC and North America, supplied by Verizon. I had to liaise with many telco's around the world as well as Verizon, managing the delivery of local tail circuits between our offices and Verizon's connection point. All the offices went online on schedule, network traffic was faster, more resilient and CMC saved money by having one integrated network, instead of multiple separate deals.
Live TV Broadcasting
2009, CMC Markets
I managed the installation of data links and hardware between CMC's office and a broadcast intermediary company, to enable live TV broadcasting from the dealing room to broadcasters like BBC News, Sky News and Bloomberg.
Managing office relocations in the UK, Europe, Asia and the US
As well as filling the role of IT project manager, I was often involved in the office design and physical construction, as well as the normal IT fit-out. I have managed the delivery of new office space for almost 1,000 employees.
Office Builds & Relocations
2015
Zurich
Network fit-out and staff relocation
30 people
I was asked to help with an office relocation in Zurich, amalgamating staff from two floors the client wanted to return to the landlord, to a new floor in the same building, the client had rented. The move required installing new LAN hardware on the new floor and connecting it to the existing LAN on remaining floors, inter-floor copper and fibres, patching about 80 positions and relocating approximately 30 members of staff. The IT fit-out and staff move was completed on schedule.
Responsibilities:
-
Fit-out: None
-
New installation: LAN hardware, telephony
-
Relocation: LAN hardware, telephony, desktop PCs, staff
_________________________________________________
2014
Stockholm
Office relocation
15 people
The client wanted to relocate their office in Stockholm to new premises. There was no fit-out work involved, just the installation of the new telephone, MPLS and internet circuits, followed by the relocation of the staff and their equipment.
Responsibilities:
-
Fit-out: None
-
New installation: WAN
-
Relocation: LAN hardware, telephony, desktop PCs, staff
Frankfurt
Office relocation
25 people
I project managed the relocation of staff and equipment to new premises in Frankfurt. I looked after the elements of the project, not under control of the main contracting company in Germany - the installation of new telephone, MPLS and internet circuits and a new Wi-Fi network. I liaised with the internal End User Support department to organise the relocation of the staff and their equipment and the internal Networking department for the delivery and connectivity of the new circuits.
Responsibilities:
-
Fit-out: None
-
New installation: WAN
-
Relocation: LAN hardware, telephony, desktop PCs, staff
_________________________________________________
2010
Paris
New office fit-out
4,000 sq. ft / 372 sq. m
I was tasked with designing and planning the IT installation for a new sales office, for 12 staff, seminar room and meeting rooms. I project managed the design, supply and installation of the IT infrastructure; electrics, LAN cabling, WAN links, LAN hardware, telephone lines and PABX system, desktop computers / peripherals and audio visual hardware.
Responsibilities:
-
Fit-out: electrical
-
New installation: LAN cabling, LAN hardware, WAN, telephony, desktop PCs, audio visual, security, furniture
-
Relocation: None
London (133 Houndsditch)
Telephony migration
400+ people
The client wanted to relocate their existing telephone system to their new HQ and at the same time, improve the resiliency by hosting it across two data centres. I managed the installation of new phone lines into the new office and second data centre, followed by splitting and balancing the phone system hardware and configuration between the two sites. The final stage was the relocation and testing of over 400 handsets, as staff were moved to the new HQ office.
Responsibilities:
-
Fit-out: None
-
New installation: telephony
-
Relocation: telephony
London (Leadenhall Street)
Office relocation
50 people
I was called back to reactivate an office I had decommissioned six months previously and given one month to do it. I produced seating layouts, a relocation plan and got a new WAN link installed. Once all the IT infrastructure had been installed, furniture, staff and their equipment were relocated.
Responsibilities:
-
Fit-out: None
-
New installation: WAN
-
Relocation: LAN hardware, telephony, servers, desktop PCs, staff
Auckland
Office relocation
15 people
Relocation of a sales office to new premises in Auckland. I was asked to design the IT infrastructure for the new office, organise the installation of new data cabling, phone and data lines, and produce a relocation plan that a local company would follow to move the staff and equipment.
Responsibilities:
-
Fit-out: None
-
New installation: LAN cabling, LAN hardware, WAN, telephony
-
Relocation: None
_________________________________________________
2009
Hamburg
Office relocation
30 people
The client wanted to relocate their office from Frankfurt to Hamburg, then decommission the original office. There was no fit-out work involved, just the installation of the IT infrastructure (data cabling, electrics, WAN links, LAN hardware, telephones lines), followed by the relocation of the staff and their equipment.
Responsibilities:
-
Fit-out: floor plan designs, electrical
-
New installation: LAN cabling, LAN hardware, WAN, telephony
-
Relocation: telephony, desktop PCs, staff
Vienna
Office relocation
5 people
I project managed the relocation of staff and equipment to new premises in Vienna. There was no fit-out work involved, just the installation of the IT infrastructure (data cabling, electrics, WAN links, LAN hardware, telephones lines), followed by the relocation of the staff and their equipment.
Responsibilities:
-
Fit-out: floor plan designs, electrical
-
New installation: LAN cabling, LAN hardware, WAN, telephony
-
Relocation: telephony, desktop PCs, staff
Munich
Office relocation
10 people
I project managed the relocation of staff and equipment to new premises in Munich. There was no fit-out work involved, just the installation of the IT infrastructure (data cabling, electrics, WAN links, LAN hardware, telephones lines), followed by the relocation of the staff and their equipment.
Responsibilities:
-
Fit-out: electrical
-
New installation: LAN cabling, LAN hardware, WAN, telephony
-
Relocation: LAN hardware, telephony, desktop PCs, staff
London (Leadenhall Street)
Office relocation
70 people
An office with 70 staff was relocated to other premises belonging to the client, as the lease on the Leadenhall Street address was ending. Plans were made to relocate the staff over three weekends and then decommission the original office's IT infrastructure and dispose of any unwanted furniture.
Responsibilities:
-
Fit-out: None
-
New installation: LAN hardware, telephony
-
Relocation: LAN hardware, telephony, servers, desktop PCs, staff
2008
Oslo
New office fit-out
1,990 sq. ft | 185 sq. m
Refurbishment of an office in the centre of Oslo. The challenge here was to fit staff desking, a manager's office, a seminar room and a meeting room, into a small area. I managed all the aspects of the project, from the architectural design and the interior construction, to the installation of the office components; IT infrastructure and hardware, security and furniture.
Responsibilities:
-
Fit-out: floor plan designs, construction, mechanical, electrical, lighting
-
New installation: LAN cabling, LAN hardware, WAN, telephony, desktop PCs, audio visual, security, furniture
-
Relocation: None
Milan
New office fit-out
3,219 sq. ft | 300 sq. m
Refurbishment of an office in a redeveloped office block in central Milan. Office space was required for 11 staff, meeting rooms and a seminar room. I managed the entire project, from the architectural design and the interior construction, to the installation of the office components; IT infrastructure and hardware, audio visual, security, furniture and signage.
Responsibilities:
-
Fit-out: floor plan designs, construction, mechanical, electrical, lighting
-
New installation: LAN cabling, LAN hardware, WAN, telephony, desktop PCs, audio visual, security, furniture
-
Relocation: None
Madrid
New office fit-out
3,390 sq. ft | 315 sq. m
Refurbishment of a very dated office interior in Madrid, in a building that had a listed status. Floorplans & related documentation had to be created to ensure the project complied with legislative restrictions on the building. I managed the entire project, from the design and the interior construction, to the installation of the office furniture and IT infrastructure.
Responsibilities:
-
Fit-out: floor plan designs, construction, mechanical, electrical, lighting
-
New installation: LAN cabling, LAN hardware, WAN, telephony, desktop PCs, audio visual, security, furniture
-
Relocation: None
_________________________________________________
2007
Dublin
New office fit-out
3,000 sq. ft | 278 sq. m
Fit-out of an empty office in the city centre of Dublin. Office space for 19 staff, meeting rooms and a seminar room. I managed the entire project, from the architectural design and the interior construction, to the installation of the office components; IT infrastructure and hardware, audio visual, security, furniture and signage.
Responsibilities:
-
Fit-out: floor plan designs, construction, mechanical, electrical, lighting
-
New installation: LAN cabling, LAN hardware, WAN, telephony, desktop PCs, audio visual, security, furniture
-
Relocation: None
Edinburgh
New office fit-out
3,200 sq. ft | 297 sq/ m
Complete fit-out of an empty office in Edinburgh. Office space was created for 7 staff, four meeting rooms and a seminar room. I managed the entire project, from the architectural design and the interior construction, to the installation of the office components; IT infrastructure and hardware, audio visual, security, furniture and signage.
Responsibilities:
-
Fit-out: floor plan designs, construction, mechanical, electrical, lighting
-
New installation: LAN cabling, LAN hardware, WAN, telephony, desktop PCs, audio visual, security, furniture
-
Relocation: None
_________________________________________________
2006
Stockholm
New office fit-out
3,200 sq. ft | 297 sq m.
Complete fit-out of a shell and core office space in central Stockholm. Office space for 22 staff, reception, meeting rooms and a seminar room. I managed the entire project, from the architectural design and the interior construction, to the installation of the office components; IT infrastructure and hardware, audio visual, security, furniture and signage.
Responsibilities:
-
Fit-out: floor plan designs, construction, mechanical, electrical, lighting
-
New installation: LAN cabling, LAN hardware, WAN, telephony, desktop PCs, audio visual, security, furniture
-
Relocation: None
New York
New office fit-out and staff relocation
2,500 sq. ft | 232 sq. m
I designed the floorplans for the new office for 24 staff and managed the fit-out process with local sub-contractors in New York. I selected and managed the installation of the furniture, network cabling, IT hardware, audio visual and security. Upon completion of the fit-out, the computers, telephony and network hardware were relocated from the original office in mid-town NYC.
Responsibilities:
-
Fit-out: floor plan designs, construction, mechanical, electrical, lighting
-
New installation: LAN cabling, WAN, telephony, audio visual, security, furniture
-
Relocation: LAN hardware, telephony, servers, desktop PCs, staff
_________________________________________________
2005
Frankfurt
new office fit-out and staff relocation
11,990 sq. ft | 1,113 sq. m
Thirty staff were relocated to a new office in central Frankfurt. I managed the whole project, including the architectural design (done with a UK-based architect), the interior refurbishment and installation of data and phone lines, phone system, networking, security, furniture and signage. I managed a mixture of German and UK suppliers and local German trades and sub-contractors.
Responsibilities:
-
Fit-out: floor plan designs, construction, mechanical, electrical, lighting
-
New installation: LAN cabling, LAN hardware, WAN, telephony, security, furniture
-
Relocation: LAN hardware, telephony, desktop PCs, staff
Pizza boxes, blades & chassis
I have delivered many projects that involved changing servers and storage.
Migrating servers between data centres, installing new hardware,
decommissioning old hardware, upgrading operating systems.
There's not much I haven't done with servers.
Servers & Storage
Avaya telephone system migration
January - June 2020, TP ICAP
Part of a larger data centre migration programme to vacate three data centres, bring a new one online and migrate applications to the AWS Cloud. I was responsible for
-
Lift and Shift of 20 applications from old OnPrem data centres to the new OnPrem. Mixture of physical migrations and vMotioning.
-
Working with the DBA team to upgrade Oracle databases from versions 11 and 12 to 19c and migrating the databases to a new infrastructure.
-
Migration of 80 SQL server databases to a new SQL farm.
-
Decommissioning 43 applications.
Migration of IT Services from one IT support provider to another
July - December 2018, MS Amlin
MS Amlin wanted to migrate all supported services and users from one outsource partner to another, to save £3m a year. I worked on four streams of this programme:
-
Network Changes;
-
New circuits, VLAN stretching, gateway migrations, DMZ, firewall & F5 changes.
-
-
Migration of the Citrix environment used by 150 staff
-
Customising the build image into MS Amlin’s Citrix estate
-
System and UAT
-
Cut-over to the new Citrix.
-
-
Upgrading user's hardware
-
Upgrading desktops & laptops, remote worker's hardware, replacing WYSE terminals
-
Communicating with users.
-
-
Migration of infrastructure servers
-
MS Exchange, Enterprise Vault, domain controllers and file servers.
-
Removing performance bottlenecks
July - December 2016, MS Amlin
Users were complaining about poor performance of their SAS environment. The root cause was their physical server was no longer fit for purpose. I managed the installation of the new hardware into a datacenter then the VMs were migrated to the new hosts. A cut-over point was agreed and the new server moved from UAT to PROD and the old server was decommissioned.
Data Warehousing
January - July 2016, MS Amlin
Installation and new HP 3PAR storage and a collection of the latest generation HP DL360, DL380 and DL580 servers were installed, for a storage transition and data warehousing project.
Resizing IT infrastructure for the Grand National
2012 & 2013, Ladbrokes
Ladbrokes wanted their online and mobile platforms to stay operational on Grand National Day - the busiest day of the year for every bookmaker with triple the volume of bets compared to a normal Saturday's racing and football. Historically, every bookmaker’s IT systems crashed on Grand National day due to volume.
I managed the analysis of every aspect of technology to identify weaknesses and resolve them. We created new customer journeys, made better use of existing F5 load balancers, introduced the use of AWS' Content Delivery Network to reduce the volume of data our web servers had to provide, right-sized database resources, all to try and keep the system operational.
In 2012, Ladbrokes online presence survived until one hour before the race started, but in 2013, the IT systems stayed up all day for the first time ever.
I heard from ex-colleagues they still use the principles we developed in 2012. Based on those experiences, I wrote a book about planning IT Infrastructure for large events (which you can buy on Amazon. Search for “IT Planning for the Grand National”).
Reducing the time taken to refresh non-Production databases
2012, Ladbrokes
I reorganised Ladbrokes database infrastructure and deployed a new app for replicating production and test databases, to eradicate the loss of 5-10 days of testing each month, when Stage databases were refreshed using traditional backup and restore methods. The end-result was non-prod database refreshes took just 5 minutes.
Performance improvement programme
2012, Ladbrokes
I managed a programme of twenty-two projects to improve the performance and resilience of Ladbrokes production web servers, application servers, load balancers, firewalls and backups. The programme was delivered to plan & budget.
Eradicating system bottlenecks in the BI system
2012, Ladbrokes
The BI system was running slowly and failing to produce reports to management on time. I managed analysis of the bottlenecks, deployment of more powerful hardware, OS and software upgrades and memory upgrades. The impact was production of BI reports became problem free and production time reduced by 2 hours.